Dear Experts,
I am trying to create a material cost estimate with the Primary Cost Component Structure ( Primary Tick activated in OKTZ). I have done the budget planning ( Activity Independent) through KP06, did the splitting of cost against the defined activities, updated the activity quantity in KP26 and did the price calculation using KSPI. Upon Processing KSPI under components I can even see the cost as a whole being split into the desired cost components ( Split by primary cost elements) but when I execute the cost estimate ( CK11N) the same split is not shown. Instead the system updates the activity cost as per the secondary cost element of type 43 assigned in the relevant activity.
As per the configuration, I have set up only one cost component structure with Primary activated and have assigned the relevant primary cost elements to the relevant buckets along with the secondary cost elements which are technically required. Also, the CCS has been maintained in the CO version.
I know the topic has been discussed in the forum a lot of times but failed to find any relevant solution to the same. Request you all to kindly help and let me know if where am I going wrong.
Regards
Anurag Gupta