Hi Gurus
For put away strategy P and mixed storage A system allows to place different materials or different batch in the same bin. For this strategy we define the storage bin sections A or B. Then assign those sections to the combination of storage type, storage bin type and storage unit type.
We cannot change strategy because we need the system propose a specific SU during the removal process.
Kindly help on how to proceed with this bug.
The situation is similar to scenery showed in threat WM putaway strategy & mixed storage but it´s locked without final solution.
Thanks in advance
Regards
.