Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 3184

CMS Transport Studio Assembly

$
0
0

I have some doubts about transport studio.

 

1) I have one sc call siga2007, It contain the customers developments

e.g A,B,C.

2) I need transport a specific development or change, e.g. D.

3) the SC Siga2007 Contain developments. e.g. A, B,C., when i press

the assembly option. The system take SC Siga2007 and re-create a SC

with A, B, C, D?.

and in option approve and then production, the system take all

developments and update SC Siga2007?

4) the system only take the change or new development and transport

it ?.

I need solve this doubt, because if the case is option 3) i have a

problem, because i do not want transport some changes in developments,

i need only tranport the change of one development in this case D .

 

If posible isolate only the change to transport it?

Best regards


Viewing all articles
Browse latest Browse all 3184

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>