Subcontracting PO within same plant

$
0
0

We have the below business scenario

 

1. We maintain unique material codes for Bulk and Small packages.

2. Our packing people take bulk product from the warehouse and repack them to small packages.

3. They write how much bulk is consumed and how many small packages are made and this value is not always constant, it varies on the way how packaging people are packing.

4. If 28 units of Bulk material is consumed to prepare 57units of small packages, business want the Moving average price of the small package equal to the value of bulk material consumed

Ex: if 28 units of Bulk material is 56$ then the moving average price of small pack is 56$/57units = 0.982$.

 

My Advise to the Business is as below:
1. Inventory adjustment using moment type 711 to reduce Bulk and 712 to increase small pack through MB1C

2. Adjust the moving average price manually through MR21.

 

 

But business is asking to do a Sub-Contracting PO.

 

Is my solution easy or is there a better a better solution through sub contracting PO

 