Is it possible to perform the planning at multiple manufacturing plant location simultaneously by considering material availability & Capacity across all the plants.
We know that in ECC its not possible but is there anything S4 is providing this functionality. We are not talking APO SNP here as its out of scope.
Thanks
Devi Shetty