Hello experts,
I am trying to schedule a multiple counter maintenance plan. I have set up the cycle/unit for the measuring points as 20 EA and 30 EA. I am creating measurement documents manually through transaction codes IK11, such that counter value for first meas. pt. is 40 while the second one is only at 20.
Now, when I am trying to schedule the plan, I am getting the following error. I have tried both IP10 and IP30.
When I tried to start the cycle, it asked me for the time and date and I went ahead with what was proposed in the pop-up box. That was 06/08/2016 09:18:15.
I have tried to start the cycle by giving a time before the creation of measurement documents as well as a time after their creation. Either way, I am stuck. The odd thing is that this problem was not happening earlier. It started only a day back and in between I have not changed any configuration at all.
Please refer to the following screenshots for the plan details. I have created the plan using transaction code IP01.
Here are the measuring docs for the meas. pts., along with the measurement times. You can see the current system time also.
I have faced similar kind of issue for both multiple counter plan and plan based on both time and performance basis.
Wherever measurement docs are involved, there seems to be a problem.
Please help as this needs to be resolved quickly.