Disclaimer: I have very limited technical knowledge of how SAP P1P functions, as I am a daily user only. I need to find out if it is possible to set up an EDI feed which will post production (manual transaction as a MIGO 101 document). We already have the 940 and 945 docs set up for the shipping end.
Can anyone offer me any insight or point me in the right direction?