Hi,
Need your advise on how to meet the below requirment
MY Data Flow DSO1 --> DSO2.
DSO1:
One of the key fields of DSO1 is Load Date (System Date)
DSO 2:
In Start routine of DSO2 we are using function module Period Covert based on Load Date which is used in Select statements.
I am in processing of doing some bug fix and required to do a data load from DSO1 --> DSO2.
Is there any way i can restrict the package to load data specific for one load date.....
Ex:DSO1 consists of records related to 300 unique Load Date.......
IS there any way that each package loads all the records specific to one load date
Thaks in advance