Hi Experts,
We have a situation where the meter reading is not seen on installation and EL31.
There are 4 registers out of which only register 2 is billable.
After it is billed , there are changes done on other 3 registers' meter readings.
The meter reading date is changed to 00.00.0000 in EL29. Also the meter reading status is changed to '0'.
After these changes , we do not see meter reading for register 2 in EL31 and on installation.
However we could not replicate the same on quality.
Is it possible to change the meter reading date to 00.00.0000 and meter reading status to 0 in EL29? How can it be done ?
Thanks,
Nachiket