Dear SAP ISU Experts,
I am trying to bill interval demand meters with installation group.
The maximum peak demand is billed for secondary installations, but for billing the primary installation the maximum demand is billed after deducting the demand for each time slice.
In this scenario, data exchange between from secondary to primary is not supported as maximum demand for any register will occur at any point in time.
The maximum demand is calculated in RTP interface. But in this scenario the profiles of secondary installation cannot be allocated in primary installation as sub meters are no longer in primary installations.
Any help is welcome to solve this scenario.
Rick John